O’Hare Flyer is committed to being a community partner.
Since announcing the project, the team has been reaching out to and meeting with communities from the West Loop to Rosemont. We’ve had several conversations with Cook County Forest Preserves, held a community forum in Forest Park, met with mayors, village presidents, chambers of commerce, local labor unions, colleges and universities, convention workers and more; and we’re just getting started. This page will be updated with new content as the project advances.
What We Have Heard
Through conversations with community members at events, like the Forest Park Community Forum, the O’Hare Flyer team has prepared the updated FAQ below.
-
Safety is our top priority, and we will use the most advanced safety systems available.
Our first step in ensuring safety is to lift the tracks above the ground and put them onto earthen berms and bridge structures, also known as grade separation. We will replace all four street-level crossings in the Village of River Forest at Forest Avenue, Augusta Street, Keystone Avenue, and Thatcher Avenue with train overpasses. These grade separations have been part of our plan from the start. The O’Hare Flyer will pay for these permanent improvements at a cost of more than $100 million. We are also working with state agencies on a new train overpass at Madison Street in Forest Park. Grade separations improve safety for drivers, cyclists, and pedestrians, and they keep traffic moving forward. Additional grade separations are being evaluated in other communities such as Melrose Park, Franklin Park, River Grove, and Schiller Park.
Technologically, our safety plan starts with state-of-the-art positive train control, a federally required technology that tracks every train’s location and speed in real time. It automatically slows or stops a train before it can go too fast, pass a stop signal, or enter a work zone. The O’Hare Flyer will also have real-time 24/7 monitoring so that issues can be identified and addressed before a problem develops.
Train travel is already one of the safest ways to get around, and passenger train derailments are extremely rare. We’re building to American Railway Engineering and Maintenance-of-Way Association standards, using the same proven track design, continuously welded rail on concrete ties, that has carried more than a million trains on the Northeast Corridor, the nation’s busiest passenger rail line, since it was rebuilt in the 1970s.
The most serious passenger rail accidents in recent decades were caused by trains going too fast for track conditions or passing stop signals. Positive train control, which will be built into O’Hare Flyer from day one, is designed to prevent exactly those failures. The trains we’re considering also use Jacobs bogies, which link the cars, so they’re designed to stay upright and in line in the unlikely event that a derailment ever occurs.
-
When we announced O’Hare Flyer in late August, our plan already included raising the tracks and eliminating four street-level crossings in River Forest, at Forest Avenue, Augusta Street, Keystone Avenue, and Thatcher Avenue. The plan also includes our team working with state agencies on a new overpass carrying the train over Madison Street in Forest Park.
Since then, we’ve met with residents and local officials up and down the route, and we’ve heard the same priority in other communities. We’re now doing preliminary engineering on potential additional grade separations for the O’Hare Flyer in Schiller Park, Franklin Park, River Grove, and Melrose Park.
Grade separations improve safety for drivers, cyclists and pedestrians and eliminate the traffic impacts of trains in a community. When grade separation is achieved, the blinking lights, gate closings and routine horn and bell sounding that are familiar to many Chicagoland communities are no longer required. Every grade-crossing decision must ultimately undergo rigorous regulatory review and consultation.
Most of the track along the route sits on existing embankments and bridges. All new overpasses will meet state clearance requirements, which range from 13.5 to 15.5 feet depending on location.
-
Keeping people and animals safe is part of our safety planning and a top priority for our team. Accordingly, there will be fencing along the entire corridor. The type will vary by location, with a more aesthetic design in residential areas, and we’ll work with each community on what fits.
Depending on the location, we’ll use high berms and fencing, like in River Forest and Forest Park, or fencing alone in other areas. The bottom of the fence in areas like Thatcher Woods will have a fine mesh to keep smaller animals out, and we’ll follow the Forest Preserves of Cook County’s recommendations on fence height. This kind of fencing is widely used for commuter rail across the U.S. We’ll also have motion-sensing, real-time, 24/7 monitoring of the right-of-way to spot anything that gets through. Wildlife crossings in the forest preserve will give animals a safe way to cross, and grade separations at crossings will allow traffic, pedestrians, and bicyclists to pass safely. Trespassing on railroad property is illegal and dangerous, so we want to prevent it.
-
The Forest Preserves of Cook County is an important partner, and we’ve already met with them and had follow-up conversations. The project in this area will be built entirely on railroad property and won’t take any forest preserve land. We’re working closely with the Forest Preserves on where wildlife crossings and fencing will go, on planting native prairie grasses, sedges and forbs along the tracks, and on evaluating effects on wildlife. Any tree work along the edge of the right-of-way will follow the Forest Preserves’ established process, including replacing any trees in the unlikely event that they are damaged. As part of federal environmental review, the Forest Preserves will also be formally consulted.
-
Forest Park officials asked us to evaluate a station in the village, and we welcomed the request. A stop in Forest Park would make the O’Hare Flyer accessible to more people in the western suburbs. It would also give us a convenient point along the route to respond to passenger emergencies, and a new access point for our employees. Any station would require an agreement between the Village and the O’Hare Flyer team, developed through the Village’s normal process.
-
Our tracks will stay within the existing railroad right-of-way. Unlike major transportation projects of the past, this project does not displace a single home or business. This corridor has carried trains for more than a century, and for most of that time it had multiple tracks.
We’ll be restoring the CN right-of-way to two tracks as it was for more than a century. All our track will be brand new: continuously welded rail on concrete ties with elastic spring clips and neoprene pads to absorb sound and vibration - built for a quiet, smooth ride, like the very best services across Europe and Asia.
-
The O’Hare Flyer is built for travelers, and we expect strong demand from business travelers, convention-goers, tourists, and visitors. Our current ridership and revenue projections were prepared by an independent, internationally recognized forecasting firm whose traffic and revenue studies are relied upon by lenders and investors to finance major transportation projects. The forecasts feed a financial model built by a global consulting firm with deep project finance experience.
Our commitment is that a ride will cost significantly less than a rideshare and more than a Blue Line fare. We’re still working out fare structure details, including fares for any stops between downtown and O’Hare, and we’ll share them at the appropriate time as the project moves forward.
-
Noise: Our trains will be battery-electric, and battery-electric trains are dramatically quieter than either passenger or freight diesel locomotives and much quieter than Chicago’s L trains. With no diesel engine, most of the sound comes from the wheels on the rail. We’re building all new continuously welded rail on concrete ties with elastic spring clips and neoprene pads to absorb sound and vibration and eliminate the "clickety-clack" of older track. All of this is designed to keep our trains as quiet as possible. We will also deploy state-of-the-art sound mitigation technology currently deployed in Europe next to residential neighborhoods along the route.
Grade separations reduce noise, too. Federal rules typically require trains to sound their horns when approaching street-level crossings and crossing gates to ring warning bells. Where we eliminate street-level crossings, such as Forest Avenue, Augusta Street, Keystone Avenue, and Thatcher Avenue in River Forest, and Madison Street in Forest Park, routine horns and bells are no longer needed.
We’re also exploring additional grade separations in communities like Melrose Park, River Grove, Franklin Park, and Schiller Park along the route, which would further reduce noise and other impacts on nearby neighborhoods. Grade separation improves safety for drivers, cyclists and pedestrians and reduces the impact of trains in a community. When grade separation is achieved, the blinking lights, gate closings and routine horn and bell sounding that is familiar to many Chicagoland communities are no longer required. Train operators may still sound horns in an emergency, as safety requires.
Pollution: Our trains produce no exhaust. We’ll also handle the few existing freight customers along the section of track next to the Eisenhower and north of Franklin Park with a battery-electric locomotive. By getting riders out of gas-burning automobiles and onto a battery-electric train, O’Hare Flyer will further reduce carbon dioxide and particulate pollution.
Weight: According to manufacturers, an eight-car train like the ones we’re considering weighs a small fraction of a typical freight train. The track and bridges are designed for much heavier trains, which also helps to reduce noise and vibration.
-
O’Hare Flyer is first and foremost a passenger service. No freight trains will run on our tracks in River Forest, and no freight trains will run on our tracks north of the Eisenhower Expressway in Forest Park. In those areas, existing freight railroads will continue to run on their own track, just as they do today.
Outside those areas, we will take over a small number of existing freight deliveries in limited portions of the corridor. Today, this means five customers: one customer in the area north of Franklin Park, and four customers between Cicero Avenue and Circle Avenue on the south side of the Eisenhower Expressway. These customers have received deliveries for decades, and we’re committed to continuing those deliveries reliably.
Railroads providing freight service are regulated by the Surface Transportation Board (STB) and by the Federal Railroad Administration (FRA). “Class III” is the federal classification that the STB applies to smaller railroads, commonly known as “short line railroads”. There are more than 600 of them across the country, many serving local businesses that depend on rail. As a Class III, our freight service will operate subject to applicable FRA safety rules, inspections, and crew qualification standards and subject to the federal common carrier obligation, as any other freight railroad. Our Class III short line will make deliveries using a battery-electric locomotive.
-
As part of our feasibility work, we’ve done preliminary studies on engineering, environmental impacts, traffic, ridership, and property titles. More detailed studies will follow over the multi-year development of the project. The project will go through federal environmental review under the National Environmental Policy Act, or NEPA. Those studies are prepared under the direction of the federal agency overseeing the project and include things like noise and vibration, land use, public safety, and environmental reviews, which necessitate identifying and evaluating any effects on state- and federally listed threatened and endangered species.
-
Yes. Federal environmental review for a rail project includes noise and vibration analysis, and we’ll complete every study that process requires. A significant portion of our route runs along the existing CSX rail line next to the Eisenhower Expressway (I-290), where we will have a second track so Flyer trains can pass each other going to and from O’Hare. The analysis will look at conditions like train frequency and Flyer trains passing each other on that stretch. We also plan to do sample vibration studies along the corridor, including near residential areas. State-of-the-art sound mitigation technology will be deployed on tracks adjacent to residential neighborhoods.
-
Yes. We have many detailed engineering maps of the route, and we’ll have more available at upcoming public meetings where our team can walk through them with residents. In the meantime, because the O’Hare Flyer will run within existing railroad right-of-way, you can already see the corridor in available mapping tools like Google Maps and Google Earth.
-
Trains will run every 15 minutes in each direction, so about eight trains an hour. While most of the route is single track, trains will pass each other on a long double track portion of the route along the Eisenhower Expressway. The proposed schedule is designed for airport travelers, and how long they wait for the next train matters as much as how long the ride takes. Frequent service is what makes the train a real alternative to driving or rideshare, which is why leading airport express services such as London’s Heathrow Express and Stockholm’s Arlanda Express run every 15 minutes or less. Other European trains often run at even greater frequency.
-
Safety is our number one priority. We are committed to a safe, welcoming experience for all travelers on the O’Hare Flyer, and we will work collaboratively with community partners to connect individuals experiencing homelessness with resources, support, and services. Like Metra and the major freight railroads, we will have a police force, with an emphasis on balancing passenger safety with compassion, dignity, and commitment to community.
-
We haven’t picked a specific manufacturer or model yet, but it will be like the battery-powered train Metra recently unveiled here in Chicago, the first built for North America, which Metra plans to run on the Rock Island Line starting in 2028. That manufacturer is one of three being considered. Caltrain in California has also ordered a battery-powered train for service to Gilroy, and trains like the ones we’re considering run across Europe, including in Germany, Switzerland, and Poland. Whichever we choose, it will be proven technology from a global leader in train manufacturing.
-
No single entity decides. Federal agencies will review the project, including environmental, technical, financial, and legal reviews. We need final agreements with the freight railroad partners that own the corridor, as well as with the City of Chicago, including with the Department of Aviation. Investors and lenders will also play key roles. Finally, communities along the route have a voice throughout.
We’re committed to talking with communities, their elected representatives, and local agencies. Those conversations are already shaping the project and leading to modification of our original plan. For example, community feedback, combined with discussions with Forest Preserves officials, has led us to design for safe wildlife crossings through Thatcher Woods.
-
We believe more rail options and better rail service benefit the Chicago region and are necessary for Chicago to continue to be a world-class city. CrossRail Chicago is the High Speed Rail Alliance’s long-term vision for an electrified regional rail network linking O’Hare, the Loop, and communities across the region. The O’Hare Flyer complements that vision. It would deliver a modern, battery-electric rail connection to O’Hare years sooner, backed by private investors. Cities with world-class transit options, including London, Stockholm, Vienna, and Berlin, run both airport express services like the O’Hare Flyer and regional rail services, and in each city, the offerings strengthen each other. Chicago deserves the same level of service. The High Speed Rail Alliance supports the O’Hare Flyer, and we’re glad to have them in our corner.
-
Yes. We’ve already done preliminary traffic work as part of our feasibility studies, looking at how vehicles move in and out of potential station areas and key crossings. As the project moves through federal review, we’ll complete more detailed analysis and the access studies that the process requires. Local municipalities lead planning for walking and biking in their communities, and we’ll continue working with them.
-
For the Chicago area, the O’Hare Flyer will be an economic game changer, creating thousands of union construction jobs and permanently enhancing our ability to attract conventions, corporate headquarters, and tourists. According to area trade associations, the challenge of connecting O’Hare Airport and downtown Chicago has been a major competitive disadvantage. O’Hare Flyer will eliminate that problem by creating a world-class airport transportation service.
The project will go through federal review, which includes looking at socioeconomic effects on the communities along the route. Research on homes near transit is encouraging: a 2013 study by the American Public Transportation Association (APTA) and the National Association of Realtors (NAR) found that during the 2006–2011 housing downturn, homes near high-frequency transit in the Chicago area held their value about 30% better than the region overall. A 2019 update of this work from APTA and NAR that took a broader analysis of geographic regions across the country validated these findings.
-
O’Hare Flyer places a high priority on protecting the environment. O’Hare Flyer will use railroad right-of-way that has been in place for more than a century, which minimizes impacts and makes the most of land that’s already a rail corridor. Based on community feedback and consultation with the Forest Preserves, we are evaluating how we can raise the train tracks through portions of the railroad right-of-way alongside Thatcher Woods, a solution that would be an improvement to the area. Regardless, the tracks will stay on the railroad right-of-way and won’t extend into the woods.
O’Hare Flyer will prioritize keeping trees intact. Some branches that hang over the tracks will likely need periodic trimming, and any tree work will follow the Forest Preserve’s process, including replacing damaged trees. A geotechnical study of the soil through the Forest Preserve will guide any decisions about digging and effects on tree roots.
The project also understands the importance of the Silver Creek Prairie between First Avenue and the Des Plaines River, so our landscape plan doesn’t include herbicides along the track. We will control weeds with high-pressure hot water and plant locally sourced native prairie grasses, sedges, and forbs along the tracks between Thatcher Avenue and 1st Avenue. We will never use salt on the track adjacent to the forest preserve or near the prairie.
A preliminary bridge study found the Rainbow Bridge over the Des Plaines River is structurally sound and does not need to be replaced. The bridge is private property, owned by Canadian National Railway, and being on it or on the tracks is illegal and unsafe today and in the future.
-
Protecting people and animals is a top priority for the O’Hare Flyer. Whatever structure we build through the forest preserve will be designed so animals can safely move from one side of the tracks to the other. In the case of a berm, that will mean wildlife crossings—short, reinforced tunnels—so animals can safely get from one side of the tracks to the other. We’ll work with the Forest Preserves to make sure these passages follow the routes animals already use, and research shows that when crossings are built where animals already travel, they adapt to them quickly.
Research from Cornell University shows that migrating birds generally fly more than 1,000 feet up, well above our berm or other elevated structures. We’ll work with the Forest Preserves on effects on birds that rest in Thatcher Woods during migration. The Forest Preserves has indicated that endangered bats are not known to be present at this location, but we’ll evaluate effects on all state and federally listed species, including bats. Sound from our trains will be far lower than nearby road and airplane noise. Our analysis during environmental review will measure that.